ScottAI / Project standard
From first idea to stable launch

Build it right.
Ship it ready.

Every requirement we keep rediscovering — now one evidence-backed, automation-ready project standard.

View
236 checks
20 lifecycle stages151 critical gates62 automation-ready checksProgress is local to this browser
01

Intent & thesis

The project has a reason to exist and a finish line.

0%0/10 cleared
02

Canonical identity

One project name maps cleanly across every system.

0%0/10 cleared
03

Workspace & repository

The local and remote project baseline is reproducible and safe.

0%0/10 cleared
04

Agent continuity

Codex, Claude Code, and humans share durable project truth.

0%0/13 cleared
05

Product system

Scope, objects, flows, states, and acceptance criteria are explicit.

0%0/10 cleared
06

Architecture & changeability

The system has clear owners, seams, trust boundaries, and recovery paths.

0%0/11 cleared
07

Design system & UX

The product feels coherent, usable, accessible, and trustworthy on every target device.

0%0/13 cleared
08

AI command layer

Plain language becomes typed, gated, observable work instead of uncontrolled model behavior.

0%0/16 cleared
09

Hermes operating layer

Execution uses the right durable primitive, capability posture, grants, and proof.

0%0/16 cleared
10

Data & storage

Data is modeled, validated, isolated, recoverable, portable, and bounded.

0%0/11 cleared
11

Authentication & authorization

Identity, sessions, roles, and recovery fail safely.

0%0/9 cleared
12

APIs, tools & integrations

Every external dependency is bounded, observable, cost-aware, and recoverable.

0%0/11 cleared
13

Security, privacy & legal

The public product has a documented threat, data, compliance, and secret posture.

0%0/13 cleared
14

Quality & verification

Every important seam and user path has proportionate proof.

0%0/13 cleared
15

Observability & operations

Failures, costs, schedules, and system health are visible and actionable.

0%0/11 cleared
16

GitHub & collaboration

Source control, review, automation, and ownership support safe change.

0%0/10 cleared
17

Vercel & deployment

Builds are reproducible, environments are correct, and production can be recovered.

0%0/11 cleared
18

Domain, content & discoverability

The public address, metadata, brand assets, and support paths are complete.

0%0/13 cleared
19

Public launch gate

The real product, real domain, and real operating team are ready for public use.

0%0/13 cleared
20

Post-launch & learning

The launch becomes a stable product and every lesson improves the system.

0%0/12 cleared